Turns orders and forecasts into a production plan that respects your machines, materials and staff, and updates it when things change.
Planning production in spreadsheets cannot keep up with changing orders, so plans are outdated as soon as they are printed.
Built to order
Decides the order and timing of jobs on each machine or line to reduce waiting, changeovers and late orders.
Job order chosen by habit causes long changeovers, idle machines and urgent orders waiting behind routine ones.
Built to order
Calculates how much of each item to keep in stock and when to reorder, based on demand, lead time and the service level you want.
Stock levels set by rule of thumb mean some items pile up while others run out.
Built to order
Suggests what to order, how much and from which supplier, considering prices, discounts, lead times and budget.
Buying item by item without the full picture misses volume discounts and creates unnecessary small orders.
Built to order
Plans delivery routes for your vehicles, deciding which driver visits which customers in which order.
Routes planned by memory waste time and fuel and make delivery times hard to promise.
Built to order
Finds the lowest-cost way to move goods between factories, warehouses and customers, choosing quantities and transport options.
Shipping decisions made one at a time ignore the network as a whole and cost more than necessary.
Built to order
Learns from your machines’ sensor and maintenance data to estimate which machine is likely to fail soon, so it can be serviced in time.
Waiting for machines to break is expensive, while servicing everything on a fixed calendar wastes parts and labour.
Built to order
Shows all maintenance work in one place: open repairs, planned services, machine history, costs and downtime.
Maintenance records on paper make it impossible to see which machines cause the most trouble.
Built to order
Records every stop on the line with its reason and length and shows which causes cost the most production time.
Downtime is accepted as normal because nobody measures where the lost hours actually go.
Built to order
Calculates how much your lines can really produce, given shifts, setup times, efficiency and product mix.
Capacity guessed from machine specifications is far higher than reality, which leads to broken delivery promises.
Built to order
Plans people, machines and materials across projects or production, showing who and what is free and when.
Without a shared plan, the same person or machine is promised to two jobs at once.
Built to order
Builds a computer model of your factory or process to test changes, such as a new machine, layout or shift pattern, before making them.
Changes to a factory are expensive to undo, and intuition often misjudges how a whole system will react.
Built to order
Finds the step in your process that limits total output by analysing cycle times, queues and utilisation.
Improving steps that are not the bottleneck costs money and changes nothing in total production.
Built to order
Measures production performance with clear indicators such as output, efficiency, scrap and overall equipment effectiveness, by line and shift.
Without consistent indicators, every line and shift seems to be doing fine until results disappoint.
Built to order
Breaks down the real cost of each product into materials, labour, energy, scrap and overheads.
Average cost figures hide products that cost far more to make than anyone realises.
Built to order
Displays live readings from your process, such as temperatures, pressures and flows, raises alarms and supports control decisions.
Processes watched only by occasional manual readings drift out of range before anyone reacts.
Built to order